MTS Provides Safety Support in the Demolition of the Wando River Bridge Piling Removal
MTS safety personnel were onsite for the preparation, loading and use of 450 pounds of dynamite that was utilized to remove a piling from the Wando River Bridge location. The team arrived early morning to assist in handling the dynamite and inserting blasting caps, before installing it into the piling for the big event. TheRead More